TNEB Limited
Tamil Nadu
934tenders tracked
829live now
0awarded
–value awarded
–bidders per tender
0companies seen
Bidders in this department
| Company | Participated | L1 | Won | Win rate | Value won | Last seen |
|---|---|---|---|---|---|---|
| No bidder names published for this department yet. They appear from results, award records (history import) and result PDFs. | ||||||
Recent results
Procurement of LT Single phase Angle X arm
–estimate
Closed, result awaitedResult not published
Procurement of LT GI Pin
–estimate
Closed, result awaitedResult not published
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out, Damaged 300 NB pipe of Emergency Bearing cooling water line OHT I to Unit I, II and III ACW system upto Unit III mill plant area from OHT I to CLWPH entrance including Supp
–estimate
Closed, result awaitedResult not published
ECHP-I-Removal of frequent wet coal chocking in secondary crusher A, B C Vibrex Screen 20A, 20B, 20C, discharge chute A, B C, fine coal chute A, B C, and screen feed chutes A, B C at Secondary Crusher House-I
–estimate
Closed, result awaitedResult not published
TTPS Operation Circle CAD Overhauling of storm water pump A and B in Storm water pump house II and Screen wash pump A, B and C in cooling water pump House II
–estimate
Closed, result awaitedResult not published
TTPS Operation Circle CAD CWPH II Load testing of 3 Ton Capacity Electrical hoist in Chlorination plant, 10 Ton Gantry crane Machine No G 019, 25/5 Ton EOT crane Machine No E 051 at cooling water pump house II and 5 Ton capacity Electrical Hoist in
–estimate
Closed, result awaitedResult not published
Supply of 7/12 SWG Stranded GI Stay Wire
–estimate
Closed, result awaitedResult not published
ICHP-Collection, clearing of trash screen rejects at JT-3 segregated of lump coal and stones from trash screen rejects loading, transporting ,weighing and unloading the segregated lump coal and stones at the respective yards
–estimate
Closed, result awaitedResult not published
TTPS Operation Circle CAD Cleaning and painting of 200 NB Raw water pipe line and 300 NB service water pipe line including cost of consumable and paint
–estimate
Closed, result awaitedResult not published
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out, Damaged 200 NB pipe of Service water I and II discharge to OHT I for a length of 190 mtrs including Supply of 200 NB MS seamless pipe
–estimate
Closed, result awaitedResult not published
ICHP-Provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ICHP Stage-III Conveyors
–estimate
Closed, result awaitedResult not published
ICHP-Dewatering the stagnated rain water during rainy season at conveyor 49S, 49N, 54S, 54N and Coal yard etc.
–estimate
Closed, result awaitedResult not published
Supply of 7/11 SWG Stranded GI Stay Wire.
–estimate
Closed, result awaitedResult not published
ICHP- Cleaning and tightness checking of insulators and bus bars of HT Bus 5A 5B in Coal Handling Control Room-V
–estimate
Closed, result awaitedResult not published
ECHP-I-Overhauling Load Testing of 7.5 T, 5 T 2 T capacity chain block at conveyor 43, 46, BFD 9A, 9B and Reject Conveyor-1 at PCH-I
–estimate
Closed, result awaitedResult not published
ECHP-I- Replacing the existing wornout Skirt board assembly by new skirt board assembly for Conveyor-43 at PCH-I.
–estimate
Closed, result awaitedResult not published
E-tender for Providing One No. Diesel/Petrol driven Vehicle Van/Jeep on Hire basis for official use of the Assistant Executive Engineer/TLC / Kumbakonam for a period of one year from the date of utilization of vehicle
–estimate
Closed, result awaitedResult not published
E-tender for Providing One No. Diesel/Petrol driven Vehicle Van/Jeep on Hire basis for official use of the Assistant Executive Engineer/TLC-III / Trichy for a period of one year from the date of utilization of vehicle
–estimate
Closed, result awaitedResult not published
ICHP-Replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in Conveyor-49
–estimate
Closed, result awaitedResult not published
Procurement of Proportional pressure relief valve and 7 Pin Connector 8 Nos
–estimate
Closed, result awaitedResult not published
Supply of Iron and steel materials, fabrication and erection of Structures, Providing earth bore and earth mat, Erection of 110 KV equipments etc., for 110KV bay extension work at Elanagar 110/22 KV SStowards Establishment of Nallur 230/110 KV SS
–estimate
Closed, result awaitedResult not published
Procurement of Saw Tooth Expansion joints for hot air duct of XRP803 Bowl mills style I and III 2Items
–estimate
Closed, result awaitedResult not published
Supply of Helical Worm Reducer Gear Box assembly suitable for 36 Inch gravimetric feeder cleanout conveyor of HP 803 Bowl mills
–estimate
Closed, result awaitedResult not published
Supply of 7/12 SWG Stranded GI Wire
–estimate
Closed, result awaitedResult not published
Supply of No.6 SWG Solid GI Wire
–estimate
Closed, result awaitedResult not published
Supply of No.8 SWG Solid GI Wire
–estimate
Closed, result awaitedResult not published
Supply of 7/11 SWG Stranded GI Wire
–estimate
Closed, result awaitedResult not published
Work Contract for Body Building and driver cabin as per specification for 10 Ton Capacity Lorry Chassis
–estimate
Closed, result awaitedResult not published
Supply of 20 Watts LED Tube Light 42 Watts LED Well Glass Light Fitting and LED Aviation Obstruction Lamp with fitting
–estimate
Closed, result awaitedResult not published
FABRICATION, MANUFACTURE, SUPPLY (EXCEPT POWER TRANSFORMER AND BREAKERS), ERECTION, TESTING AND COMMISSIONING OF 33 KV /11KV SUBSTATION EQUIPMENTS, ASSOCIATED STRUCTURES, ACCESSORIES, CONTROL PANELS ETC AT SERAKULAM VILLAGE IN TUTICORIN EDC
–estimate
Closed, result awaitedResult not published
House keeping works in EE/D/Srivilliputhur Division office with Revenue branch, AEE/Town and Rural/ SVPR office and AE/R/North and South/ SVPR office in Srivilliputhur Division for the period of one year from the date of utilization.
–estimate
Closed, result awaitedResult not published
CE/D/TNJ-001
–estimate
Closed, result awaitedResult not published
Spec.No.030/26-27, Dt.24.09.2026
–estimate
Closed, result awaitedResult not published
Rendering Para Medical Assistance at MTPS II Dispensary Through Outsourcing for a period of 365 days from the date of commencement
–estimate
Closed, result awaitedResult not published
Meter Reading of Current Consumption
–estimate
Closed, result awaitedResult not published
Hydrazine Hydrate
–estimate
Closed, result awaitedResult not published
Meter Reading of current consumption
–estimate
Closed, result awaitedResult not published
Supply of 110KV Solid core Insulators
–estimate
Closed, result awaitedResult not published
Supply of Thyristor Based Battery Chargers of 48V with Current rating of 80A 40A 20A for Communication Application
–estimate
Closed, result awaitedResult not published
Supply of 230KV Solid core Insulators
–estimate
Closed, result awaitedResult not published
Supply of NEW BRUSH CUTTER MACHINE FOR WEED GROWTH
–estimate
Closed, result awaitedResult not published
TTPS Operation circle MPM I Unit III Removal of all the damaged insulation in the Hot Primary Air ducts from Airpreheaters to mills and insulating the duct with LRB wool mattresses and cladding with GI sheet of 0.63 mm thickness and removal of ash
–estimate
Closed, result awaitedResult not published
TTPS Operation Circle MPM I Unit III Overhauling of Mill gear box, under bowl, Separator Top assembly etc of Mills during the forthcoming overhaul
–estimate
Closed, result awaitedResult not published
Meter Reading of current consumption
–estimate
Closed, result awaitedResult not published
Improvement works to the damaged cable trench brick walls and replacing the damaged precast cover slabs with new ones at 110/11 KV yard in the Sattur SS premises.
–estimate
Closed, result awaitedResult not published
Improvement works of replacing the damaged asbestos cement sheet roof by PPGL sheet roofing at the Technical Training and Development Centre building in SE office premises at Virudhunagar.
–estimate
Closed, result awaitedResult not published
Housekeeping for Cleaning the Floor area and outer area around the control room building, AE office and Store room building at Alamarathur 110 22KV Sub Station for a Period of One Year From the Date of Utilization
–estimate
Closed, result awaitedResult not published
Housekeeping for Cleaning the Floor area of AEE OandM Pethappampatty and AE OandM Pethappampatty Section offices for a Period of One Year From the Date of Utilization
–estimate
Closed, result awaitedResult not published
Repair and maintenance works for the existing damaged 10 No. poles in 11 KV, 33 KV yards and in 11 KV bus coupler side in Sivakasi Urban 33/11 KV SS premises.
–estimate
Closed, result awaitedResult not published
Providing One Number Petrol Diesel Driven Jeep Van TATA SUMO QUALIS or other superior models on daily Hire basis for the official use of Assistant Executive Engineer Special Maintenance Sivaganga Date of registration of vehicle as 7 Years
–estimate
Closed, result awaitedResult not published
Hiring of 1 No Petrol or diesel Diesel Driven Vehicle Van Jeep FOR THE OFFICIAL USE OF Executive Engineer OM Pennagaram
–estimate
Closed, result awaitedResult not published
Housekeeping for Cleaning the Floor area , outer area around the building at Kongal Nagaram Section office building for a Period of One Year From the Date of Utilization
–estimate
Closed, result awaitedResult not published
HIRING OF VEHICLE FOR THE OFFICIAL USE OF Assistant Executive Engineer /R and D/MRT/CEDC/Metro/Coimbatore
–estimate
Closed, result awaitedResult not published
HIRING OF VEHICLE FOR THE OFFICIAL USE OF Subdivisions in Central Division/CEDC/METRO/CBE
–estimate
Closed, result awaitedResult not published
Supply of straight joint kit suitable for 11 KV 3x300 sq mm UG cable-50 nos
–estimate
Closed, result awaitedResult not published
Routine maintenance (Mechanical) of Fuel Oil Forwarding Pump House (FOFPH) and Fuel Oil unloading Pump House (FOUPH)
–estimate
Closed, result awaitedResult not published
Improvement works to constructing the Front side of compound wall in Inspection Bungalow at Thiruvannamalai
–estimate
Closed, result awaitedResult not published
Improvement work to constructing the compound wall by replacing damaged portion of compound wall in Central office at Thiruvannamalai EDC
–estimate
Closed, result awaitedResult not published
Operation and Maintenance of Fire Protection and Fire detection Alarm system
–estimate
Closed, result awaitedResult not published
OT 17 Cleaning of accumulated Ash inside pent house
–estimate
Closed, result awaitedResult not published
Live tenders
SUPPLY OF SEC WIRE 16SWG AND 23SWG
–estimate
Closes todayCloses 27 Oct 2026, 01:00 PM
CE/D/VPM OTE NO.07/26-27- Supply of GI Solid Wire 8 SWG to Villupuam region
–estimate
Closes todayCloses 27 Oct 2026, 01:30 PM
SE/MEDC/Metro/MDU/021/2026-27
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
SE/MEDC/Metro/MDU/020/2026-27
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Supply of GI solid wire No.6
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Hiring Vehicle for Assistant Executive Engineer O and M Rural Mayiiladuthurai Division Nagapattinam EDC
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
NCTPS I ES Circle EM I division S Dn III ESP Hot Oil Circulation of 24 Nos 75 KVA 373 5 V 70 KV DC Peak High Voltage Rectifier Transformer and Replacement of gaskets for in Unit II at NCTPS I
₹0estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Removal of silt, slush, ash deposits and other waste materials in all the drains in A-Zone area of MTPS-II
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Provision of hire vehicle on daily basis for the official use of the AEE/Tamukkam/ MEDC/ Metro Madurai
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Hire vehicle for AEE/SPECIAL/OOTY
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Hire vehicle for AEE/TOWN/COONOOR
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Hire vehicle for EE/COONOOR
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Hire vehicle for AEE/TOWN/KOTAGIRI
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Cleaning the Cold and Hot Water Tunnels and allied works in Unit 5
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Protective Maintenance Works in Chambers 5C and 5D of Forebay in Cooling Water Pump House 2
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Rectification works in Cold and Hot Water Condenser Pipes in the Western side of Unit 5 Condenser pipe line system
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Protective Maintenance Works in Hot Water Outfall structures
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Rectification works to the Damaged Ceiling and Beams in Ash Water Tank in AWPH area in Unit 5
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Protective Maintenance Works in Chambers 5A and 5B of Forebay in Cooling Water Pump House 2
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
T-2391 Procurement of ACSR Panther Conductor
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
TTPS Mech II BM Unit I Replacement of damaged bottom plate corroded portion of side plate including Supply Fabrication Dismantling and Erection of CST tank in Unit I Boiler
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Rectification works in Cold and Hot Water Condenser Pipes in the Eastern side of Unit 5 Condenser pipe line system
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Rectification of existing PA Fan Motor Concrete Bed of Unit 1 1B and Dismantling Partition Wall in between Mill Floor and Bottom Ash Hopper of Unit 1
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
TTPS ES Circle MRT II Annual overhauling works in Unit 5 for the year 2026 2027 for FSSS system Subdivision 3 MRT II TTPS
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Upgradation of excitation system including design, Engineering, Manufacturing, supply, erection, testing and commissioning suitable to the existing Hydraulic system and Digital Governor Cum Auto Sequencer Panel(DGASP) at Sathanur Dam Power House/ Sat
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
TTPS ES Circle MRT II Annual overhauling works in respect of Turbine Auxiliaries system in Unit V annual overhauling period for the year 2026 27
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
TTPS ES Circle MRT II Annual overhauling works in Unit V for the year 2026 2027 for BA SBC section Subdivision III MRT II TTPS
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
TTPS ES Circle MRT II Annual overhauling works contract of Unit 5 for the year 2026 27 in respect of Generator Auxiliaries system 230KV Switchyard and MRT 2 lab of sub division I MRT 2 Division TTPS
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
TTPS ES Circle Instn II Unit V Overhauling of 48 nos SADC cylinder positioners and air lock relays 80 Nos of instruments pertaining to SADC Heavy oil FOPH Block valves PRDS OS 35 and soot blower systems 4 nos Burner tilt cylinders 16 nos of instru
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
M257/26-27
–estimate
Closes todayCloses 27 Oct 2026, 02:00 PM
Bidder names and amounts are shown only where the department or portal published them. Verify on the official portal before acting.